Line control with OPC communication. Communication via OPC interface has been interrupted.
Energy monitor During the series start-up of the monitor, the current is measured via current measuring transformer.
ARS with piezo actuator The position of the piezo actuator is set to an analog setpoint value.
Line control with OPC communication. The downstream control unit demands production interruption.
With the DCU can upender, the magnets are switched on sequentially and all switched off at the same time after the magnet shutdown distance.
At the DCU can upender, the driver monitoring has activated the magnets.
Line control with OPC communication. Communication via OPC interface has been interrupted.
The corresponding heating element is outside the temperature tolerance.
In the case of the outside striping OSS, the temperature of the paint is outside the tolerance.
With outside striping OSS, the serial connection to the LTC is interrupted. A line stop is triggered at the welding machine.
With outside striping OSS, the supply to the Peltier element is interrupted.
User interface is disabled.
The pulsar has detected too much contamination in short-circuit operation.
OSS1, OSS2 or inside lacquering supply tank change (UTC)
A device fault has been detected at the LTC of the OSS outside seam lacquering system.