Views:

638.x Transport 1 clamp open


Description

Welding machine conveyor 1
The clamping of conveyor 1 is monitored.

Remedy

  • Close the clamping for conveyor 1.
  • Check the compressed air for the machine.
  • Check the module clamping for function.
  • Check the digital input.

All machine errors