Views:

Error 154.x Basin: insufficient lacquer flow


Description

PRC with level control
For the PRC with level control the lacquer shell is not emptied within the time determined in the setup.

Remedy

  • Execute PRC level control setup. 
  • Increase parameter for initial time at switch-on. 
  • Check lacquer flow on the can body. 
  • Check lacquer tank. 
  • Check the lacquer tubes. 
  • Check the lacquer level sensor A015:In6. 
  • Check the digital input

All machine errors