Error 154.x Basin: insufficient lacquer flow
Description
PRC with level control
For the PRC with level control the lacquer shell is not emptied within the time determined in the setup.
Remedy
- Execute PRC level control setup.
 - Increase parameter for initial time at switch-on.
 - Check lacquer flow on the can body.
 - Check lacquer tank.
 - Check the lacquer tubes.
 - Check the lacquer level sensor A015:In6.
 - Check the digital input.
 
		